Arbors at Thousand Oaks

< | >

The master plan for this 8.5-acre site included three two-story office buildings, totaling 210,000 sq. ft., developed in tandem with site amenities, hardscape and landscaping to create a unique corporate campus environment. Each building uses economical tilt-up concrete perimeter bearing and shear wall as an exterior façade, pushing the tilt-up engineering and technology to its extremes in terms of openings, articulation and detailing. When coupled with the extensive arbor, trellis and canopy elements, the overall effect is a human-scale environment rich in color, texture and detail. The newly unified campus connects these amenities and the three new buildings to the existing building on the site.

Owner:

The Hileman Company (Phase I) / Sares-Regis Group (Phase II)

Design architect:

Ronald Frink Architects

Principal:

Ronald Frink, AIA

Executive Architect:

House & Robertson Architects, Inc.

Principal:

Jim House, FAIA

Senior staff:

Doug Paterson, AIA; Gabriel Ewers

General contractor:

Oltmans Construction

Related Projects

900 Cahuenga

900 Cahuenga

BMW Plant Competition

BMW Plant Competition

The Californian at Town Center

The Californian at Town Center

Fuller Seminary Worship Center

Fuller Seminary Worship Center

Haven Park Office & Retail Campus

Haven Park Office & Retail Campus

kpe California Interiors

kpe California Interiors

LAUSD Modular Classroom Exploration

LAUSD Modular Classroom Exploration

Plaza Centro

Plaza Centro

Rosa Mexicano Hollywood

Rosa Mexicano Hollywood

Sacramento Airport Retail & Food Venues

Sacramento Airport Retail & Food Venues

Staples Center Clubs and Dining

Staples Center Clubs and Dining

Autry Museum Expansion

Autry Museum Expansion

Hollywood Center Studios

Hollywood Center Studios